shape1 shape2 shape3

The combat hall is taking shape

During the fall, the masonry work continued at a good pace and the future combat hall in the basement is taking shape.

The metal formwork for the walls is in place and the joint layout is in line with the architects’ requirements in order to ensure the strength of the materials.

The combat hall will be topped with a concrete slab reinforced by pre-stressed beams, which will also serve as the floor for the sports hall.

Share
12_macolin_01
12_macolin_02
12_macolin_03
12_macolin_04

Latest News